Facility Solutions Group designed and supervised an LED lighting retrofit for Outerbridge Crossing, a cantilever bridge spanning the Arthur Kill between New Jersey and New York. The project included both cobra head and high mast roadway lighting, building mounted wall pack and floodlights, and interior fixtures in the administration building. In addition to resulting in a cost savings of over $66 thousand annually, the new lighting system improved appearance, increased lamp life, and greatly reduced maintenance costs.