Facility Solutions Group performed two Direct Install lighting upgrades on the George Washington Bridge, a suspension bridge connecting Fort Lee, New Jersey to Manhattan, New York. This was a highly coordinated project involving extensive design requirements and scheduled lane closures on this busy roadway. Over 3,600 light fixtures were installed, resulting in an annual savings of over $417 thousand annually.